Case Studies

Commercial

West One

Leeds

Date Completed: Sept 2019

Project Duration: 2 weeks (Nights)

We undertook a full none mechanical deconstruction of a roof plant room within a multi storey office complex within the heart of Leeds. Due to the occupancy of the building all works were completed during the evenings to ensure we did not disrupt the ongoing activities of the building.

The works involved complete removal of boilers, associated pipework and installations within the boiler room.

Southern Gateway

Speke

Date Completed: Aug 2018

Project Duration: 6 weeks

We undertook various asbestos surveys to a large multi-use site in Speke constructed in the 40’s. Upon our survey we were asked to undertake a comprehensive removal package to one of the buildings on site containing Asbestos Insulating Board around a mezzanine office block. We engaged with a scaffold contractor to construct a unique scaffold design to encompass the whole of the office block to ensure we could put the area under full conditions.

Other works on site included a full environmental clean of a basement area and removal through abrasive cleaning to Asbestos bitumen adhesive within offices. Although the areas we were working in.

Manchester Airport – T1

Date Completed: Apr 2018

Project Duration: 6 weeks
(Some works undertaken during the evenings)

Were asked by Manchester Airport to undertake several removal projects to facilitate several ongoing projects being undertaken within terminal 1.

We had to ensure that the works were undertaken within airside operations ensuring that our works did not interfere with the general operation of the airport. We ensured that our works were not visible to the passengers coming through the terminal building and performed daily air monitoring around the work areas to demonstrate our control measures were first- rate.

All of our staff on site had to undergo rigorous security checks to be able to get airside passes which we completed without complication.