Units 1 – 3 Parkside Industrial

Doncaster

Date Completed: Sept 2019

Project Duration: 20 weeks

We were approached to compile a cost effective solution to the asbestos concerns within a large storage industrial unit in Doncaster. The Client following the recommendations of the survey consultant had identified extensive asbestos which required immediate removal to enable letting of the units.

We compiled a project with time scales to meet the massive demand of the site. In order to facilitate the large areas of removal required we constructed large scale enclosures and utilised the most up to date negative pressure equipment to ensure suitable air management of all work spaces were undertaken.

Acting as Principal contractor we took full care of our works with sufficient welfare facilities and site segregation from other works happening on site.

AGC Chemical Site

Thornton Cleveleys

Date Completed: Various 2018/2019

Project Duration: Various

We have undertaken several licensed and none licensed asbestos projects to the AGC chemical site. As with most Chemical sites Asbestos had been extensively installed into a majority of pipe insulations throughout production plants.

We have tailored several removal packages on site which take in to consideration the unique nature of the active production site and the requirement of exemplary health and safety standards which must be adhered to at all times.

Former Philips Site

Southport

Date Completed: Feb 2018

Project Duration: 16 weeks

We were instructed on behalf of Philips Electronics to undertake the removal of extensive quantify of asbestos insulating board (Over 3000m2) found throughout the former industrial site in Southport. The building was no longer in use and is proposed part of a larger regeneration however the asbestos was in poor condition after years of none use. Extensive pigeon Guano was present during the building so we were asked to incorporate decontamination within our work areas of the hazard material

We were able to put together a progressive solution to undertake the safe removal on site undertaking multiple buildings at the same time. We resourced high labour levels on site throughout the project to ensure a speedy completion.

We acted as Principal contractor for the works and supplied sufficient facilities for our work force and other contractors used on site.